Fabrication Leg Covers

In November 2016, Strukton International started the preparation works for the construction of 3 Leg Covers for the Shell Brent Delta decommissioning project. This project entails the removal of the 40 year old Brent Delta Platform in the North sea between Aberdeen (UK) and Norway.

Activities

The project consisted of the following activities:

  • Design review of the permanent design
  • Preparation of Shop drawings, Method statements, Quality and Management plans.
  • Procurement of rebar, concrete and temporary facilities. 
  • Construction of 3 Octagonal Leg Covers measuring 15.3 meter (2 no) and 13.3 meter (1 no) in diameter.
  • Preparation of load-out and transportation plans.
  • Load-out with Sheerleg and transportation to Rotterdam. As built documentation.